GLUS

gulishicoupler@outlook.com 0086-13530964111

Contact Us

  • gulishicoupler@outlook.com
  • 0086-755-23270067
  • GLUS, Liaokeng Road 52-1, Shiyan Street, Baoan District, Shenzhen, China
HOTLINE: +86 13530964111

Contact Us

  • gulishicoupler@outlook.com
  • 0086-755-23270067
  • GLUS, Liaokeng Road 52-1, Shiyan Street, Baoan District, Shenzhen, China
HOTLINE: +86 13530964111
2023 11-23
GLUS Shenzhen metro line 10 engineering Since GLUS hynix signed the project, its product quality and service quality has been well received by contractor, the project specified using its products.
2023 11-23
GLUS participate in shenzhen before the municipal engineering Deep in shenzhen before the sea port of modern service industry zone before the sea of shenzhen municipal engineering VI standard, China railway construction by solid its long-term cooperation unit construction, the project plan with a total investment of 5.21 billion yuan, this block budget is 2.85 billion yuan.The project all rebar connection products and equipment supplied by GLUS.
2023 11-23
GLUS in chongqing road station ~ exhibition engineering station interval GLUS company signed a contract with China railway group, shenzhen international convention and exhibition center project, trusted by its products and service, in the new construction of chongqing road station ~ exhibition engineering projects, the station interval specified using GLUS products and equipment.The project by the GLUS established cooperation unit, bureau of China railway 22 construction.
2023 11-23
GLUS advance together mountain base engineering vehicle By the turbine to undertake the shenzhen metro line 10 engineering (together mountain stand) traffic facilities, the land is located in buji street, ground floor land area of 2656.
2023 11-23
GLUS Laos south tahe 1 hydroelectric project Laos south tahe 1 hydropower station is located in the northern Laos glue province, with a total installed capacity of 168000 kilowatts, install 3 56000 - kw hydro-generator units, annual output 720 million KWH, will be completed and put into operation in 2018 to produce electricity.The project after several rounds of screening, finally using GLUS brand reinforced connection products.
Site Map Copyright © Shenzhen GLUS Building Material Co., Ltd. All Rights Reserved